Container No.:
|
|
Date of Production:
|
|
|---|---|---|---|
|
Item No.
|
Item
|
Instruction
|
Quality Check
|
|
001
|
Container Weight
|
Above 30 tons, displayed on its Label
|
|
|
002
|
Container Age
|
Less than 3 years for 20’ feet standard container
|
|
|
003
|
Exterior Surface
|
No Decals
|
|
|
004
|
Container Manufacture
|
Comply with International Standard in design, detection, assaying, size, load bearing, and operation
|
|
|
005
|
Application
|
Shipment by road, railway, sea
|
|
|
006
|
Vertical groove
|
There should be a vertical groove next to each door bolt.
|
|
|
007
|
Container door lock
|
Each door panel should be with a good bar lock.
|
|
|
008
|
Sign
|
No Hazard sign on container.
|
|
|
009
|
Interior Surface
|
The following objects that are potential danger for flexi-tank are forbidden to appear inside the container: fragments, sharp protrusion, nails etc. The interior surface should be clear and dry.
|
|
|
010
|
Container floor
|
Make sure there are no sharp corners, crack, nail, solder joints etc on the floor.
|
|
|
011
|
Container Inside Wall
|
The irremovable potential threat should be transformed or covered with adhesive tape etc.
|
|
|
012
|
Corrugated paper
|
Put corrugated paper(1.5m-1.7m in height) along the 3 inside wall, and fasten them with adhesive tape.
|
|
|
013
|
Corrugated paper
|
Put a layer of corrugated paper on the floor and fasten it with adhesive tape.
|
|
|
014
|
Flexi-tank
|
put the flexi-tank at the central floor, 1.5m away from the door.
|
|
|
015
|
Flexi-tank
|
Make sure the valve on right hand.
|
|
|
016
|
Flexi-tank
|
Unfold the flexi-tank
|
|
|
017
|
Flexi-tank long aileron
|
Make sure the extra part of the 2 long edges be equal.
|
|
|
018
|
Flexi-tank
|
Fold the extra part oppositely.
|
|
|
019
|
Flexi-tank short aileron
|
Fold the extra part of the short edge, which is next to door, for 50mm.
|
|
|
020
|
Steel pipe
|
Put the first steel pipe in the vertical groove.
|
|
|
021
|
Steel pipe
|
Put 2 short plastic pipes on each end of the first pipe vertically and fasten them with adhesive tape.
|
|
|
022
|
Steel Pipe
|
Put the second steel pipe on the 2 former short plastic pipes.
|
|
|
023
|
Steel Pipe
|
Do as the first steel pipe, the same with next pipes.
|
|
|
024
|
Head Board
|
Make the smooth side of head board face inside.
|
|
|
025
|
Head Board
|
Install the first head board.
|
|
|
026
|
Head Board
|
Put the second board on the first, fasten the two board on the pipes with fast cable ties.
|
|
|
027
|
Head Board
|
Seal the board crack with tapes.
|
|
|
028
|
Corrugated paper
|
Cover the head board with a layer of corrugated paper too, to avoid friction between board and flexi-tank.
|
|
|
029
|
Container door
|
Lock the left door panel, paste the warning sign on it.
|
|
|
030
|
Container door
|
Lock the right door panel tightly.
|
|
|
Address of Installation
|
|
Head to:
|
|
|
Worker Signature:
|
|
Supervisor Signature:
|
|
|
Date:
|
|
Date:
|
|