Regulation of Flexi tank Installation
 
Table: Regulation of Tongshuai Flexi-tank Installation
 
Container No.:
 
Date of Production:
Item No.
Item
Instruction
Quality Check
001
Container Weight
Above 30 tons, displayed on its Label
 
002
Container Age
Less than 3 years for 20’ feet standard container
 
003
Exterior Surface
No Decals
 
004
Container Manufacture
Comply with International Standard in design, detection, assaying, size, load bearing, and operation
 
005
Application
Shipment by road, railway, sea
 
006
Vertical groove
There should be a vertical groove next to each door bolt.
 
007
Container door lock
Each door panel should be with a good bar lock.
 
008
Sign
No Hazard sign on container.
 
009
Interior Surface
The following objects that are potential danger for flexi-tank are forbidden to appear inside the container: fragments, sharp protrusion, nails etc. The interior surface should be clear and dry.
 
010
Container floor
Make sure there are no sharp corners, crack, nail, solder joints etc on the floor.
 
011
Container Inside Wall
The irremovable potential threat should be transformed or covered with adhesive tape etc.
 
012
Corrugated paper
Put corrugated paper(1.5m-1.7m in height) along the 3 inside wall, and fasten them with adhesive tape.
 
013
Corrugated paper
Put a layer of corrugated paper on the floor and fasten it with adhesive tape.
 
014
Flexi-tank
put the flexi-tank at the central floor, 1.5m away from the door.
 
015
Flexi-tank
Make sure the valve on right hand.
 
016
Flexi-tank
Unfold the flexi-tank
 
017
Flexi-tank long aileron
Make sure the extra part of the 2 long edges be equal.
 
018
Flexi-tank
Fold the extra part oppositely.
 
019
Flexi-tank short aileron
Fold the extra part of the short edge, which is next to door, for 50mm.
 
020
Steel pipe
Put the first steel pipe in the vertical groove.
 
021
Steel pipe
Put 2 short plastic pipes on each end of the first pipe vertically and fasten them with adhesive tape.
 
022
Steel Pipe
Put the second steel pipe on the 2 former short plastic pipes.
 
023
Steel Pipe
Do as the first steel pipe, the same with next pipes.
 
024
Head Board
Make the smooth side of head board face inside.
 
025
Head Board
Install the first head board.
 
026
Head Board
Put the second board on the first, fasten the two board on the pipes with fast cable ties.
 
027
Head Board
Seal the board crack with tapes.
 
028
Corrugated paper
Cover the head board with a layer of corrugated paper too, to avoid friction between board and flexi-tank.
 
029
Container door
Lock the left door panel, paste the warning sign on it.
 
030
Container door
Lock the right door panel tightly.
 
Address of Installation
 
Head to:
 
Worker Signature:
 
Supervisor Signature:
 
Date:
 
Date:
 
Subscribe to site news !
who we are?
History of flexitank
Investor relations
Ideas from flexitank
Corporate responsibility
Quality Control
Food Products
Various types of oil for industrial use
Non-hazardous liquid chemicals
Heating pad
Product Information
Applications
Specifications
The composition of flexitank
Order online
Service system
Service Purpose
Regulation
Operational processes
Container Selection
Contact us
Tel: 86-532-87963171
Fax: 86-532-87963171
Email: info@cnntap.com
MSN: tsflexi@hotmail.com